Construction of the Volgograd Refinery – Tinguta IPS PPTP

Basis for project implementation:

  • Agreement between Transneft and LUKOIL on cooperation in joint projects implementation;
  • Agreement for connection of LUKOIL-Volgogradneftepererabotka to the Kuibyshev – Tikhoretsk oil trunk pipeline and to the Volgograd-Tikhoretsk petroleum products trunk pipeline.

Purpose of project implementation:

To ensure the receiving of diesel fuel meeting the Euro 5 standard produced by LUKOIL-Volgogradneftepererabotka to the PPTP system of Transneft, at the maximum of 4 MTPA.

The project saw construction of the Volgograd IPS and a section of the petroleum product trunk pipeline from Volgogradneftepererabotka to the Volgograd IPS.

The project was implemented in 2017.