Revamping the Kuibyshev – Tikhoretsk and the Zhirnovsk — Volgograd OTPs (oil trunk pipelines) to ensure the supplies of up to 14.5 MTPA of crude oil to Volgograd Refinery

Basis for project implementation:

  • Agreement between Transneft and LUKOIL on cooperation in joint projects implementation;
  • Agreement between Transneft and LUKOIL on establishing the long-term tariff on oil transportation at the section of the Efimovka – LUKOL-Volgogradneftepererabotka oil pipeline.

Purpose of project implementation:

To increase the volume of the deliveries to LUKOIL – Volgogradneftepererabotka up to 14.5 MTPA.

The project included revamping 8 existing oil pumping stations.

The project was implemented in 2017.